Skip to content

Home › Tools › Warehouse Readiness Score

Free check · 2 minutes · 12 questions

Warehouse Readiness Score

Twelve plain questions about how your warehouse really runs today. Get a score out of 100, your stage, and the three gaps worth fixing first.

No sign-up to see your scoreAnswer for how things work todayShareable result
  • 01 Receiving
  • 02 Storage
  • 03 Picking
  • 04 Dispatch
  • 05 Visibility & reporting
  • 06 Systems & integration

How the score works

Each question has four answers, from “not in place” to “in place”, worth 0 to 3 points. Your total is scaled to 100.

  • 0–25 · Paper Memory and paper. Stock and lots are hard to prove.
  • 26–50 · Spreadsheet Recorded by hand, after the fact, always a little behind the floor.
  • 51–75 · Barcode-ready Good discipline, partly enforced by a system.
  • 76–100 · Fully controlled Scan-driven, visible and connected.

Questions

How is the Warehouse Readiness Score calculated?

Each of the 12 questions has four answers scored 0 to 3. Your total is scaled to 100: 0–25 is Paper, 26–50 Spreadsheet, 51–75 Barcode-ready and 76–100 Fully controlled.

Is this a benchmark against other warehouses?

No. It measures how controlled your own processes are, question by question. It does not compare you with other companies.

Do I have to share my email to see my score?

No. Your score, stage, area breakdown and top 3 gaps are shown straight away. The email is only for the full report with all 12 answers explained and a step-by-step plan.

Who should take the check?

Whoever knows the warehouse floor best — a warehouse manager, operations head or owner. Answer for how things actually happen today, not how they should.

Close your gaps on your own process.

A tailored demo, on your warehouse. No cost, no obligation.

Get a free demo